Warehouse floor - London Gateway Port

High Strength Concrete Floor Removal with steel fibre reinforcing inside existing warehouse.

Surface mining W250i SM 2 Steel Fiber reinforced floor removal 1

Following issues with a warehouse floor Power Plane were asked for a solution to remove the existing structure quickly and accurately.

This was undertaken using two W250i machines in surface mining mode with forced air breathing apparatus for our operatives.